Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

could i arrange a faulty and healthey battery bank togather
in parallel , if your ans is not then why?

Answer Posted / jayanta dutta

No we could not arraneg a faulty and a healthey battery bank togather in a parallel. Because it consume more energy but backup remain the same. Result energy lost.

Is This Answer Correct ?    1 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

I WANT YHE TECHNICAL AND ELECTRICAL SPECIFICATIONS OF 2x4MW 11KV 2x10MW 11KV 2x25MW 11KV 2x100MW 11KV HYDEL POWER PLANT i.e PROTECTION SYSTEM,MONITORING,CONTROL SYSTEM,GENERATION,SYNCHRONISATION,METERING PLEASE SEND THE DETAILS TO MY MAIL ID SPRAVEEN_222@YAHOO.CO.IN

2097


what happen if generator of micro hydro running at only a small percentage of its capacity, as a comparison, if the diesel generator that runs on only a fraction of its capacity there will be a wet stacking

1958


Why let through energy not considered for ACB breaker while cable sizing?

2424


What current flows in the transformer primary when its secondary is open?

1268


Explain what cmos is and its benefits?

1112


Define noise?

1180


why steady state stability limit is greater than transient stability limit ? How it can be explained ?

2927


If i have two 3000 kW motors and the whole facility requires a 10 MVA transformer. What would be better installing two 5 MVA transformers(one for 1 motor ) or just a single 10 MVA transformer for both of them. Give reasons for your answer.

6146


In a large office how do we calculate required number of light fittings, assuming fittings are 4x18W or 2x36W fluorescent fitting ?

1884


A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.

1809


how to changeover ups in this power failur time?

2011


What is the alternate solution for testing of polarity by using polarity tester while its milli ammeter does not works?

2004


how much winding resistance of 0.75kw to 12.5kw 3ph sqwiralcage induction motor?

3007


132/6.6πš”πšŸ πšπš›πšŠπš—πšœπšπš˜πš›πš–πšŽπš› πš—πšŽπšžπšπš›πšŠπš• πš‘πšŠπšœ πš˜πš—πšŽ πšŽπšŠπš›πšπš‘ πš™πš’πš πšπšŽπšπš’πšŒπšŠπšπšŽπš. 𝙸'𝚟𝚎 πšŠπš—πš˜πšπš‘πšŽπš› πšπš›πšŠπš—πšœπšπš˜πš›πš–πšŽπš› 𝚘𝚏 6.6πš”πšŸ/415𝚟 πšŒπšŠπš— 𝙸 πšŒπš˜πš—πš—πšŽπšŒπš πš—πšŽπšžπšπš›πšŠπš• 𝚝𝚘 πšœπšŠπš–πšŽ πšŽπšŠπš›πšπš‘ πš™πš’πš 𝚊𝚜 𝚘𝚏 13/6.πš”πšŸ πšπš›πšŠπš—πšœπšπš˜πš›πš–πšŽπš›?? π™Έπš π™½πš˜.. πšƒπš‘πšŽπš— πš πš‘πš’??

988


what is working process of star delta controlling circuit ?

1894