Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

why we +ve load distribution in 24v and -ve load
distribution in 48volt in the telecom sector.?

Answer Posted / aree dewan

coz in telecom sector ac is always ground wheras dc is used
for battery bank as well as for BTS sector..

Is This Answer Correct ?    1 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what size steel armoured cable is required to support 1500kva capacity. would 70mm squared be enough or would I need 90 or 120mm squared 3c plus earth

1379


ii) A shunt motor supplied at 230V, runs at 900 rpm when the current is 30A. The resistance of the armature is 0.4 ohms. Calculate the resistance required in series with the armature to reduce the speed to 600 rpm, assuming that the armature current is then 20A. [12]

2347


Define unilateral circuit?

1232


A 3 phase transformer's (Y-Y) Y and B phase is (Y and B connection not broken) broken from neutral and R and Nutral connection is ok, what will be the relay tripping and why

1963


what are the breakdown voltage rating of mini- curcuit'transfarmer!

2165


I want to put this query to SENIOR & EXPERIENCED ELECTRICAL ENGINEERS. 1)I want to know about the control circuit diagrams for control panels. I found it difficult to understand. Is there ant booklet through which we can learn the circuit diagrams? 2)I want to learn about conduiting, laying cables, preparing cable schedules and various techniques which is the part of building infrastucture(construction field). I don't have any experience in this area. I have experience in control panels only. that's why i am not getting any opening in building infrastucture (construction field).Can I get the job in this field as Trainee Engineer? How to enter this field? I need job in PUNE

1927


How can calculate the earthing strip of Copper/GI for rating of 30kV,discharge current 10KA Lightning arrester.

2319


hi frenz,its aswathy.i hve aplied for the hpcl test on feb,pls send the test patern & the placement papers as soon as possible. mail-id :kjaswathy@gmail.com

1779


DIFFERENCE BETWEEN NORMAL TRAFO AND THRISTER TRAFO?

2608


Explain the operation carried out in thermal power stations?

1033


We normally make oil soak pits under Transformers. Oil from soak pit goes to collection pit. We provide granules/pebbles under transformers. My question is weather granules/ pebbles to be filled in soak pit or not? if yes upto what level?

10443


What is the difference between electrical earthing and electrical grounding?

1142


what will happen if frequency is below 50 hz?

2021


how pt is using

1940


Can anyone tell the proper diagram of star delta starter????

1924