Answer Posted / priyadarshini
Output determination works on condition technique similar
to other SD determination procedures
Step 1: Define condition table (if needed)
Step 2: Define access sequence
Step 3: Deinfe Output types
Step 4: Assign accesss sequence to output type
Step 5: Define output determination procedure
Step 6: Assign output types to output det procedure
Step 7: Assign output det procedure to document headers or
items
Output types can be assigned to partner function
Is This Answer Correct ? | 22 Yes | 8 No |
Post New Answer View All Answers
Can items in a sales order belong to different distribution channels?
how can I do (config)? if my product category like this 1 product brand exam 101 brand A, 102 brand B 2 product type exam 501 type water, 502 type resin my sale deal is every customer can buy mix product category if buy 400.00 each can get free goods 10.00 each from any product in mix cat exam customer order line brand type quantity 1 101 501 100.00 2 101 502 100.00 3 102 501 100.00 4 102 502 100.00 mean customer meet target can get free 10.00 each but customer can select material in mix category chot trinnamaitip
How can a customer can connect his SAP ECC system to his SAP CRM system
How to create sales group?
What two ways of number assignment for documents or master data do you know? Explain the difference between them.
HAVE 100 GOODS WITH BATCH, CAN WE DELETE BATCH NOW
What is the latest release of sap transportation management? : transportation management
Do you know what’s availability check is?
What is a 'customer-material information record'?
What is material determination? Can you do two materials for one material?
We want to explode bill of material automatically at time of order entry and explode an equipment bom in the sales order. What are the setting required?
What’s forward scheduling and backward scheduling activator? There’s a concept called forward scheduling and backward scheduling logic when you do an availability check whenever your order is created system will check whether it’s forward scheduling or backward scheduling, if it’s fatal we have a concept of how is it working, how is that you created as part of your available promise concept? Whatever that date is being considered as part of the logic, whatever the date that is configured or we maintain the data to say know that system tell to create this output back scheduling
which screen support consultant uses in support project?
what are the components of sd?
IF u have worked on EDI IDOC, while sending PO to vendor how u connect to the system. Tellme the entire design and steps of the screen. how it looks.When i told we need to create port, partner profile, outbound idoc process. Interviewer not satisfied.