Answer Posted / karthik
hello
this is karthik iam much intersted in acting.
i wanted to become an artist.If u required an artist plz contact me.my mail id is anukar11@yahoo.com
Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
why development length = 50D . why not 100D
What is rate of concrete surface rendering work per sqm
for G+2 residential building how much quantity of required in foundations,sub & superstructures per sq ft area
how to calculate the density for high density concrete ? or is it same as the density of RC?
Explain what is the release of lien?
Explain moment of inertia and its importance.
how to caliculate required amount of cement and sand required for 1cu.m.
water leak detection system question & answer
What are the steps involved in the concreting process?
In earth work 1300 cum soil how to calculate how many liters require in water
what is pouring and explain
How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9
how much need cement bags for block work of wall approx 1000 hollow blocks 20x20x40cm
what is anchorage length,lap length and (dont remember the last one)
Which prize is the alternative to the NOVEL Prize?