Answer Posted / guest
nuclear power plant
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
We have drive feeding an output contactor for a 5000 hp motor @ 5kV application. The motor FLA is 629amps x 1.25% service factor = 786.25 amps The cable that we current have in place between the drive and the output contactor is 350kcmil- MV-105 (parallel cables). Per the NEC table 310.60 (C) (69). This show the cable ampacity is at 615 amps per cable for a rating of 1230 amps. We have derated the cable for the cable tray and the multiple cables application and our calculations show that after the correction factor factor we are at 922amps. 1230 amps x .75% correction factor factor = 922.5 amps. The customer is driving us to then use another safety factor of .25% off of the already derated cable. Can you please provide a longhand calculation for your solution on this application?
Draw a circuit diagram in which if button is open we can use socket and bulb as a series test circit and if button is close than simple we can use socket as any load purpose.
What is the role of feedback in a closed loop control system?
sir i ve applied for hindustan petroleum and power grid india ltd..and the exams on feb 22.can you pls send model papers and tell how to prepare for those.i need to get into any of these for sure.....
What is an automatic controller?
what is the effect of vector group while phase sequence of a generator changes,whether the vector group changes or not
Why Stabilising Resistor used in REF circuit ?
Why the field rheostat is adjusted such that the voltmeter reads 380V
What do you mean by a phase angel of instrument transformer?
What is gain margin?
How does cost of generation from hydropower plant compare with other sources of electricity?
Name the test signals used in control system
for a 500 KVA connected load, I calculated 30% of capactor for power correction. Even after using 225 KVR capactor PF is not improving. What could be reason for low Phase correction factor?
I have a situation to design sub-Distribution board/Panel meant for feeding power sockets. In the incomer CAN i Take TP MCCB with Neutral Link and All the outgoing feeders with to sockets with TP MCCB and Neutral Link? P.S : My System is IT Earthing
what are the components in electrical control panel (for example: 415V, 3-ph, panel to operate utility and 3-ph DG set).