Answer Posted / mahesh-lanco
instrument transformers are used to measure high voltage
¤t usually in transmision system.As the measuring
instruments are not up to larger values,for example if any
faul occurs KAmps of currentmay be generated there is no
equipment or measring meters are available.For this
Instrument transfrmers (potential Transforers,Current
Trasnsformers)are comes into picture.
Usually secondaries of the Current and Voltage transformers
standardised to 5Amps and 110Volts respectively.
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
1)how to reduce the value of tan delta of trasformer and CB,bushing,CT&PT,CVT ? 2)how to reduce the resistance of CB contact and its operating time? 3)plz.....send me the project report on conditioning and monitoring of substation equipment on my email id (gusaiyogendra03@gmail.com)
Why Water motor is not taking a load or pressure while everything is correct. (Note: Motor running properly)
is there any device that works properly accept relay, it may be fuse but if i want fuse of 33kv 300 amp it is avaliable, pls give me details
i need previous entrence exam papers of nhpc.
Main advantage of auto transformer over two windings transformer is that A it needs no cooling B it uses only one winding C core losses are reduced D it has simple construction
hi pal, i am vengatesh from tamilnadu(chidambaram),i have called for the written test for the post of jr executive(ELECTRICAL) of AAI ,I dont know about the question paper pattern,so any kindly help me to face the examination,post me the model question papers and some tips to write my examination to (vengi.annadurai@gmail.com)
What is the method to solve circuit using source transformation?
Explain how you intend to work under pressure to meet up with deadline target?
Define gain margin?
what will happen reduce the transformer voltage from 415v to 406v, is it save the energy,? are this methodis good to reduce the energy.?
How to calculate the no of Ceiling fan (1200mm sweep) per unit area?
please send me the previous year's question papers of jindal GET exams
Why lose 1 phase voltage in 33kv to 415v stepdown transformer
Dear all: Recently we got a question about Interface between PMS and SAP-PM.once we got a update message from PMS.we should set the deletional flag for functional location in SAP system.Is there any FM or BAPI to use?There are only functional location create and change provided by SAP. Best regards!
Can you explain about Restricited earth fault protection scheme