Answer Posted / hitesh gour
4
| Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
A son and father goes for boating in river upstream . After rowing for 1 mile son notices the hat of his father falling in the river. After 5min. he tells his father that his hat has fallen. So they turn around and are able to pick the hat at the point from where they began boating after 5 min.Tell the speed of river.
A salesperson by mistake multiplied a number and got the answer as 3, instead of dividing the number by 3.What is the answer he should have actually got?
If each of the numbers A, B and C are divisible by 2, then A*B*C must be divisible by
Plz send me the SBI exam previous question paper.
An article sold at a profit of 20% if both the c.p & s.p were to be Rs.20/- the profit would be 10% more. What is the c.p of that article?
A School Has 30% Students From Maharashtra .out Of These 20% Are Bombay Students. Find The Total Percentage Of Bombay?
All men of this party are republican . mohan is member of this party. mohan is republican is true or false or camn't say?
5) DB2 maintains information about the data a) In Tables b) In a set of tables known as DB2 catalog c) In DB2 database d) None of the above
A team of 200 wagers undertakes building work of a bridge. The total time allocated to build the entire bridge is 20 days. After 10 days since start, 200 more wagers join the team and together the team completes the bridge in required time. If the original team do not get those 200 extra wagers, how many days they would be behind schedule to complete building the bridge.
A person runs 6 ft in 1/4 sec. how much it will run in 10 sec. ans 240
Distance d=rt where r & t are positive and r is constant,as t increases then d_________
2 is what % of 4t ?
Package information is stored in a) DB2 Directory b) DB2 system tables c) DB2 catalog tables d) None of the above
A can do a work in 8 days, B can do a work in 7 days, C can do a work in 6 days. A works on the first day, B works on the second day and C on the third day rely. that is they work on alternate days. When will they finish the work.(which day will they finish the work) (7+7/168)
A contractor employed 200 men to complete a strip of highway in 200 days. After 150 days he found that only 3/5th of the strip is complete. How many additional men should be employed to complete the work on time?