pls send me the 10 years technical question papers of NTPC
AND BHEL

Answer Posted / ajay dutt

pls send me the 10 years technical question papers and
apptitude papers of NTPC .please because 02/05/2010 is exam
date please help me

Is This Answer Correct ?    4 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

why we use cascade control and feed forward control in 3 element drum level control measurement of steam drum .what is cascade and feed forward control system ?give example .

2476


How an rtd work, and what volts/current goes to a rtd to measure the resistance?

836


Coal mill Instruments Equipments for cement plant And process diagram ?

2537


what is the process to make control schematic ?

1835


In my company plc based winders are operated. one day there was a data transmission failure alarm shown on pc. as per sir instruction we have reset master plc but winders were not triped and alarm gone. so what master plc do?

1501






few questions on RS 232,1 question on relationship of impedance and turns ratio, many questions on flowmeters

1692


i want to know the interview format fot gail, instrumentation. pls answer me in habib.sami1003@gmail.com

2763


what is the current pay package for an instrumentation engineer having 2 years of experience in cryogenic technology???????

4401


defination of radial vibration?

1789


what is dc moter.

1857


Describe the function of Accumulator into the Pump

1596


can anyone tell me about the basic concepts to consider before to start a PLC panel wiring

1593


1- Explain about HPM 2- What is the FSC and explain the configuration of FSC 3- explain the complete loop of vibration, how it works (field to control room) 4- What is the use of proxymitter? 5- During job your partner effected with H2S then what you have to do. 6- what type of gland packing uses when valve glind is leaking.

2489


I need control valve ISA hand book. Is there any site to download that big book containing all the pages. Written by Paul Friedmann

1974


the pump holds on run indication into the dcs and filed local control panel remote push button condition operaton wrong like when the push button pushing conditions the pump is off and the push button release condition the pump is on totally opposite condition . And control room inside give the stop command into dcs just 1secon relay engage and again normal condition. How can I slove

1246