Answer Posted / vinayak
Quality reporting is nothing but the documentation required
for all the tests conducted on Raw mwterial used in civil
industry. for example Tests for Cement, in which all the
test are conducted for Cement and after getting the results
it is analysed whether to use the Cement or not. similarly
for sand, Coarse Aggregate, Water, Admixtures & all other
raw materials. where all the tests are conducted & after
getting the results it is analysed whether to use the
material or not. this is for raw material. other Quality
report consists of Checking the Geometry of the Buliding,
Conducting Compressive tests of Concrete Cubes etc etc.
| Is This Answer Correct ? | 43 Yes | 1 No |
Post New Answer View All Answers
What is modular elasticity?
Why is the use of granular sub-base in concrete carriageways not preferred, explain?
What is the tensile strength of marble?
how to calculate the rebar depth if forgot the foundation reinforcement (main steel)? is that any calculation or formula we have data sheet of supplier what depth what is the pull out capacity is mensioned in data sheet. if any IS code than its help full to me.
what is high type road and low type roads
What is the cost of shuttering per Sqm.? How it is calculate by thumb rule...?
what is the venturi effect in buildings? what is green house concept?different types of dams? which dam is economical arch dam or gravity dam. what are the conditions favourible to both of them?
std penetration resistance in very stiff clays lies bet 2 & 4 4 & 8 8 & 15 15 & 30
what is the weight of 10mm,20mm,40mm aggregate
what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter
How much 1 cum of M15, M20 & M25 concrete weigh?
how to calculate steel for slab or footings?
what is smart building materials?
How do you calculate the power of centrifugal pump?
how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour