Answer Posted / patilvis
Classic Waterfall Model
In a typical model, a project begins with feasibility
analysis. On successfully demonstrating the feasibility of
a project, the requirements analysis and project planning
begins. The design starts after the requirements analysis
is complete, and coding begins after the design is
complete. Once the programming is completed, the code is
integrated and testing is done. On successful completion of
testing, the system is installed. After this, the regular
operation and maintenance of the system takes place.
| Is This Answer Correct ? | 5 Yes | 20 No |
Post New Answer View All Answers
Hi I am searching job please send some details abuot ERP project and real time test plan,traceability report,test case if any relate to erp project Please help me out to get a job in testing.my email address is chiku_69@yahoo.in Thank u
uses of checklist
What makes a good software qa engineer?
What is Mixed Testing
Define what is a critical bug.
How we will test ubercate
write test condition for testing SMS service of a mobile phone maximun length is 100 character while sending and 80 character for receiving write test scenarios do not write test cases
What does 100% statement coverage mean?
how we write test cases to brs,srs,hlds,llds
Please explain me v-model clearly i want to know how it works and want to know how it use in real time on a project please tell me its urgent and important for me understand .Please tell me my mail id is Chiku_69@yahoo.in Thank u
How does quality control differ from quality assurance?
What is Cyclometric testing?
what is test scenario and test condition?
how deployment phase of SDLC differs in product based and in service based company ?
Write 2 scenarios for Integration testing? Please let me know its urgent.