The trip circuit supervision relay is used to monitor
tripping circuit healthyness.It confirms that the breaker
will trip in case of fault on the operation of relay on it.
The circuit is wired through resister and a tripping coil .
Shortly is called as TCSR.It has three coils in it one of
it is flag relay and if trip coil opens , flag indicate
unhealthyness of the tripping circuit.
| Is This Answer Correct ? | 19 Yes | 0 No |
Post New Answer View All Answers
earth also having a gravitational force (magnetic field of north and south)but it attracts any object compare to this theartifical magnetic cant perform same as earth why?
What is Diff btw Fire Alarm & VESDA System???
need to make a report. Need to choose a 3phase induction motor. Load conditions motor will operate in : Maximum Load: 30 Kw Speed: 2950 rpm Ambient temp: 20 cent Supply voltage: 440V Frequency: 50Hz need to look for the safety factor when choosing the motor, went through catalouge found a few, but dont know how to choose the safety factor allowing an extra load something above 30 KW to avoid any harm.
what is 3rd Harmonics? how it is generated in alternator
What is transient response?
state the working of discharge lamp?
HOW WE CAN REDUCE THE CIRCUIT COMPLEX OF STAR-DELTA STARTER .BECAUSE NOW WE USING ONE TIMER RELAY & THREE CONTACTOR FOR MAIN,STAR & DELTA ?IF ANY IDEAS PLZ POST.THANK U
why effective resistance should be more than static resistance in transmission line?
Electrical Engineering
How a band pass filter is constructed?
What are the types of piano switches?
how to calculate fuse rating for a motor
Dear sir my name Ankit i m Diploma holder present working in Welspun Corp ltd Anjar as Asst.engg (salary 14400/month ctc) i Would like to change my company also i have selected in ford India pvt ltd Sanand as trainee Tech with salary 12000/month so please suggest me for changing my job hope for *ve response
why does connected a indutor with mnsformeretering core of current transformer ?
WHAT SHOULD BE THE BEST CURRENT RATINGS (PRIMARY / SECONDARY)FOR A CT INSTALLED AT THE INCOMING 11KV PANE? WILL IT BE CALCULATED ON THE BASES OF MAXIMUM DEMANT VALUE OR ON SUM OF ALL TRANSFORMER'S KVA? NOMALLY MAX DEMAND REPRESENT THE MAXIMUM OPERATING LOAD OF THE PLANT AND TOTAL KVA OF (SAY 5 NUMBERS TRANSFORMERS) REPRESENT THE CONNECTED LOAD. WHICH i.e. MAX DEMAND KVA OR CONNECTED KVA ARE BETTER TO USE FOR CT CURRENT CALCULATION? PLEASE ANSWER.