What is special features of RGS Rebar detaling software?
Answer Posted / raghu
As the RGS agency itself preparing the BBS we are in big
trouble, they cannot come up with any solution for saving
cut length steel.
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
Who built the sears tower?
Minimum concrete cover in slabs, columns, beams, foundation and other st?
What is .Dwg?
Define What is aggregate?
Explain the Strength of brick?
How do we calculate absolute pressure?
is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?
what is difference between fluidity and workability also how palsticizer works
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
how many men days of loburs and masons are requirete for 1 cum,pcc (1:2:4),Pcc(1:3:6) and Pcc(1:4:8) thanking you
what is the design procedure for building
What is the FE 250 structural steel of 8mm tk plate testing sample intervals with IS code or international code?
what are the five benefits of using standard terminology in the measurement process?
what is the maximum number of course that can be laid according to IS code and the max height.
If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.