Answer Posted / muralidhar
piles are deep foundations and used when normal foundation fails and soil is very loose
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
how many kg of 20mm, 10mm, dust available in one ton stone boulder
How many feet are in 4 square yards?
What are your goals?
step by step procedure to find out the percentage of steel in coloum,beam,slab,footing in detailed
What is Critical path in Ms-Project ?
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
how much cement and sand required for 1cum rr masonry
How much material will consume for following specification water tank (9*7.5*6 feet)?
HOW MANY BAGS OF CEMEMT USED IN PER M2 OF PARTITION WALL
Where is the worlds longest elevator and how long is it?
can you give me the details of rate analysis of steel and concrete?
How to plan a project
Why are the bolts that hold steel rails together in oval holes?
Define different types of roof systems?
Use of coping on terrace wall and in 4" wall is compulsory or not ?