m10-1:3:6
m15-1:2:4
m20-1:3/2:3
m25-1:1:2
| Is This Answer Correct ? | 98 Yes | 15 No |
Post New Answer View All Answers
what is the construction cost for per cft of multistorryed building in kolkata?
what is right & short method of measurement of slab&beam
how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?
how to caliculate required amount of cement and sand required for 1cu.m.
what are the five benefits of using standard terminology in the measurement process?
what are RIB slabs explain about it
How to design staircase.plz tell me formula for the design the staircase.
What are the methods of measurement? Describe it shortly
Define absolute co-ordinates?
What are the uses of layer?
Rate analysis of Vitrified tile in cement mortor 1:3
2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32
How can i do RCC rate analysis?
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.
Can inverted beams used in pipes during construction? If yes, explain how it can be implemented?