Work flow failed when it is set to Bulk mode but it was
successful
when set to normal mode y??(All the connections are fine and
exactly
correct)?
Answer Posted / pankaj pandey
Hi,
If you are using connection for bulk load, no other session
should use it for Normal load, otherwise it will fail. You
should have seprate connection specifically for Bluk load.
I hope this will solve your issue.
Pankaj
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
what is SDLC way of code development?
What is blocking transformation?
How do you load first and last records into target table? How many ways are there to do it? Explain through mapping flows.
I have done MBA in 2008. i got job as business analyst in 2008 january through consultany. but after 3 months they are giving training Informatica developer. now iam continuing this job. my question is when iam going to interview HR people ask me many times like this " YOU ARE MBA GRADUATE. HOW YOU ARE SELECT THIS POSTION. IAM EXPLAINING WHAT I HAVE MENTION ABOVE". PLEASE TELL HOW IAM TELLING THIS QUESTION ANSWER.
What are roles and groups and benefits of using them?
What is parallel processing in informatica?
Which are the different editions of informatica powercenter that are available?
what are the Methods For Creating Reusable Transformations?
I have a flat file, want to reverse the contents of the flat file
What are the components of Informatica? And what is the purpose of each?
Define pmcmd command?
Plz can any one say me how to get the informatica certification materials and dumps
What are ETL Tools?
Please let me know how to make encryption and decryption with example?
Design time, run time. If you don't create parameter what will happen