Answer Posted / nilesh karpe
...Unit Level
Group control level(GC)
subgroup control(SC)
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
Turbidity analyzer working principle ?
What is the differerence between hysterisis and linearity.
how to calculate control valve bonnet size?? or how to select its material?
we are having yokogawa centum cs3000 dcs in our power plant. i need some of the operator guides NOT to appear in HIS0163 AND HIS 0162 but it shoul appear in HIS0164 HOW TO DO IT?
you must show the examples application and give at least 4 types of transducer/sensors that can minimize the failure during the manufacturing of the resistors.
Question on maha cement
How we can check the 2 wire proxy switch? & how it is connected to DI MODULE OF PLC?
How to calibrate radar type level transmitter for interface level? Total liquid(liq.1 and liq.2), level both the liq individually? For. Both the liquid levels how the signal will go from transmitter to dcs? How to calibrate. Single radar 9:26:55 AM for 2 different liquids in a tank?
what is the procedure to callibrate temp controller ,pressure controller,etc. suppose a temp controller showing error 1.5 degree centigrate how can i minimize it.
TECHNICAL/ARTITUDE
how to convert MA in to measuring values..and how mwasuring values into MA ?..plz ansr.i have intervw
I was working on calibrating turbidity transmitters endress+hauser at effluent polishing plant.We calibrated using NTU buffers.What happened is that when we immersed the sensor, everytime we raise and lower the sensor gradually, the reading will vary.my question is that is there any specifications on what is the required distance from the bottom of the container with buffer to the face of the sensor?Is it ok to install the sensor in a medium which has turbulence specially if bubbles are present?
Can anybody tell me which type of question are asked in the interview for the FORMULATION(Pharma) as a instrumentation engineer, & question in building managment system.
What is intrinsic safety mean.
I have completed B.E. Instrumentation & control in 2009. i have 3 year industrial job experience in chemical plant.now, I want to join M.E. in external. so, Plese say easiet way and good institute name.