what is the difference of 53 & 43 grade cement ? expailn
Answer Posted / deepthi ramachandran
The grade 43 and 53 in cement mainly corresponds to the
average compressive strength attained after 28 days ( 6724
hours) in mega pascals (Mpa) of at least three mortar cubes
( area of face 50 cm squared) composed of one part cement, 3
parts of standard sand( conforming to IS 650:1966) by mass
and P/4 (P is the percentage of water required to produce a
paste of standard consistency as per IS standard) + 3
percentage ( of combined mass of cement plus sand) of water
, prepared, stored and tested in the manner described in
methods of physical test for hydraulic cement.
721 hr not less than 23 MPa for 43 grade, 27 MPa for 53 grade
1682 hrs not less than 33MPa for 43 grade, 37MPa for 53 grade
6724 hrs not less than 43MPa for 43 grade, 53 MPa for 53 grade
| Is This Answer Correct ? | 58 Yes | 7 No |
Post New Answer View All Answers
Minimum and maximum size of the building components
1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM
1.Why we are preferring 43 grade cement than 53 grade cement. 2. Approximate cost difference between 43 and 53 grade cement. Thanks.
How to arrive d*d/162 , for finding the kg per meter , wt of steel
What is unit weight of normal concrete?
How much for the BRC lapping in full yield and half yield < and which table to get it ?
How to calculate thickness of MAT slab & Reinforcement? The dimention of under ground water reservoir is 80'X14'X 12 ft
What are the problems one might face while having a Cantilever balcony?
Why reinforcement done in shorter span in two way slabs
HOW TO CLACULATE CEMENT AND SAND CONSUMPTION FOR THE STAIRCASE KOTA FLOORING IN THE RATIO OF 1:4 50 MM THICKNESS
undistributed samples are obtained by
types of survey and levelling instrument ?
In which code the the maximum height of concrete casting has been explained
What are the RISKS during the project construction?
how to take the quantity of block work and plastering 1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate