which network in india earning more turn over per annum
Answer Posted / guest
railways
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
Define cotter joint?
How to find the max load of the engine?
what is difference between dry and flooded type chiller?
Explain different types of fits.
effect of temperature on stainless steel at temp(500C-750C) in respect of the following properties-required for silencer application 1.thermal conductivity 2.heat conduction 3.mechanical strength 4.temperature to weight ratio with values
How to calibrate Vacuum Gauges if you don't have any standard gauge available with you? please suggest procedures for calibration of Vacuum gauge like pirani gauge ,cold cathod gauge,thermocouple gauge without any standard gauge.
What is dtsi? Why it is used in motor bikes?
Who invented springs?
What is the difference between heat capacity and specific heat of a material ?
as started in the job offer notification, is our basic salary of 1lakh good for you if employed?
What is the remedy if due exchanging, valve broke out during engine running operation?
what is the velocity considering in lube oil drain line for lube of system for steam turbine?
Who built the trans alaska pipelene?
Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb
where can i get railway junior engineer(mechanical) previous years question papers?