what is role of the tester in an organaisation and project?
what is the daily work of tester?
Answer Posted / arjun reddy n
The daily work of the tester depends on day to day
activities.
1) At the time of requirements the tester role would be
going through the requirements, prepare use cases and test
scenarios based on BRS.
2) At the Design Phase,the tester role would be in
preparing the test plan and test cases.
3) At the coding stage the tester will be getting builds
and according to the test cases he has to test the
applcation in all areas.If a bug is found, he has to report
to the developer and keep tracking the defects from build
to build.
4) Daily he has to report the bugs and the applcation
status through test reports.
5) Clarify the doubts regarding the applciation through
query log document to be sent to client.
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
what is configuration management tool - send to thanu_santo@rediffmail.com. what is testing senarios
State a generalized process for load test? Or explain how you did it previously.
What are the various techniques in black box testing?
What is difference between V-Model and Agile Model?
hi, this is geetha, i have one doubt regarding the vulnerability testing. For sql injection testing is there any need for the tools to be installed. If it is what is tool and what is the method to test in sql injection testing. Plz Guide me
In manual testing, what are stubs and drivers?
What is the quality process is following in your organization.
Can anybody give me some tips on how to face telephonic interview and Write some expected telephonic questions as a 2+yr exp. in testing. Try to give Ques. that u already hv faced in telephone. Plz Help me out friends.
Define brain stromming and cause effect graphing?
could anyone explain application testing in sequence order i don't have any experience in that
My name is Akpos from Nigeria. I have finished manual testing course. Please, can someone advise me where to go on from here?
What is the limit for test steps?It should be 10/20/30etc
Is quality control similar to quality assurance?
Build with fixes has been deployed on QA environment if asked by your manager to reproduce how can you reproduce the issues? (by using the previous build) Can you access the previous build? If so ,what are the tools or how can you access?
What is bug priority?