If I want to lab 16 mm dia. bar with 20 mm dia bar with 40D
lap length which dia.should I consider for lapping
Answer Posted / ali
16mm becous it retch the yeild first
| Is This Answer Correct ? | 17 Yes | 8 No |
Post New Answer View All Answers
what is the procedure of wet seiving. n percentage of silt in different type of soil?
can you provide a link for manual design of building?
give me the mix proportion for design mix concrete M 7.5 grade 1:4:8
Please Clear My doubt . We Can Design the size of the beam by manually by the Length of the beam...What is the technique adopted
Why Vitrified tile are getting pop up.
What is the basic difference between OPC
construction workers how much time take one work or qty
What is the primary difference between adsorption and absorption?
what is the Purpose of Adding 20% of wet mortar & 1/3rd to Dry Mortar for PCC & Plastering & Rcc .is there any standard method for adding this .?
What is the difference between EPC,DBOOT and BOOT.
how much cost of single coat 20mm thick plastering per sqre meter
psc girder detail
What is the yield of 100 litres of water and 10 kg of cement in grout mix?
Concrete cover for slab, column, beam and footing?
What is the minimum size of the particles of silt soil?