Answer Posted / ajaya kumar rana
BOQ is a document used in tendering in construction
industry, which indicates quantities of various
works.Tenderer has to quote rates against given items in
BOQ. Rate should include cost of materials, machineries &
labours required to do that work.
| Is This Answer Correct ? | 20 Yes | 2 No |
Post New Answer View All Answers
How to calculate thickness of MAT slab & Reinforcement? The dimention of under ground water reservoir is 80'X14'X 12 ft
What do you mean by honeycomb in concrete?
i need gate exam civil engineering question papers with answers
material used for mendrel use to bend epoxy coated rebar
the distrubution system in water supplies is designed on the basis of avg daily demand peak hourly demand coincident of draft greater of B & C
what is high type road and low type roads
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??
how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour
Questions related to civil.engg in company
Explain creep?
what is Brick crushing strength(PSI)?
1) write Short notes about Shellow & Deep well? 2) What is the full form of SPT & SMB? write short notes. 3) write short notes about efficiency of Riveted joint.
How does a traffic light signal work ?
Which IS Code/American Code applied for coupler test of steel
Pls explain me about tension and compression in a flat slab