Answer Posted / ajaya kumar rana
BOQ is a document used in tendering in construction
industry, which indicates quantities of various
works.Tenderer has to quote rates against given items in
BOQ. Rate should include cost of materials, machineries &
labours required to do that work.
| Is This Answer Correct ? | 20 Yes | 2 No |
Post New Answer View All Answers
how many time use of plywood shuttering and IS code
How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members.
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
questions with answers to face an interview of an civil engineer regarding RCC buidings
How can you produce desired alloys and discuss their applications in daily life.
What is OSHA compliance?
SAND AND STONE AGGREGATES WASTAGE PERCENTAGE IN CONCRETING WORK?
how to calculate the density for high density concrete ? or is it same as the density of RC?
hi guys what happens if you are absent for a supplymentry exam?
HOE TO YOU PLAN TO ACCHIEVE THE GOALS?
which formula used for calculate the area of segmental arch?
What is Grid floor and mention its advantages ?
if i have to draw bending moment diagram of 4 way continous span then how to create it and how to find reaction?
What do we mean by partial moment release ??
How to measure the requirement of cement n sand for 12mm and 20mm plastering thanks in advance