what is the difference of 53 & 43 grade cement ? expailn
Answer Posted / atul bansal
53 grade cement concrete contain more heat of hydration than
43 grade cement concrete due to more surface area for
chemical reaction so more curing and precious work required
in 53 grade of cement concrete than 43 grade cement concrete
| Is This Answer Correct ? | 39 Yes | 2 No |
Post New Answer View All Answers
which has high compressive strength between hollow block and brick masonry?
In the design of bridge arguments what considerations should be made to select the orientation of the wing walls?
what is detail procedure of eccentric footing? plz. give solved exmple?
Why are the bolts that hold steel rails together in oval holes?
What is the Unit weight of coarse sand (F.M- 2.20) ?????
In jack arch floor, the rise is kept?
How much permissible bearing capacity requires for open footings(isolated) and what type pile foundatuon prefering for coastal areas?
What is the strength of 1:6:12 mix?
plumbing CPVC fitting FTE Brass full form
satart to end steps by step process of building construction...? i want to planning theme accuretly
If specific gravity of cement is less than 3.15 what is the cause?
if we know load bearing capacity of the soil and building load falling in each footing, then how to choose the type of foundation??? and if it is shallow foundation then which type of shallow foundation should be choosen i.e either strip or isolated or raft or combined or cantilever footing???????
mix design procedure for 1:6 cement mortar
What is Time period of a building and its relation with frequency ?
SAND AND STONE AGGREGATES WASTAGE PERCENTAGE IN CONCRETING WORK?