what is the difference of 53 & 43 grade cement ? expailn
Answer Posted / atul bansal
53 grade cement concrete contain more heat of hydration than
43 grade cement concrete due to more surface area for
chemical reaction so more curing and precious work required
in 53 grade of cement concrete than 43 grade cement concrete
Is This Answer Correct ? | 39 Yes | 2 No |
Post New Answer View All Answers
What Is the Thumb rule to calculate depth and dia of pile required to carry specified load on differeent soil
What are the different types of foundation?
how much cement and sand required for 1cum rr masonry
What is the strength of cement?
Define Who designed the city of Washington DC?
how much cost of single coat 20mm thick plastering per sqre meter
What are the applications of the modulus of elasticity?
Define the various stages of the project planning process in construction.
please send latest placement papers of hpcl officers trainee test. i will be very thankful to you.
i have to give lap joint fo 1Mtr steel of dia12mm,whenever i did mistake i cut less 5cm plz tell me how much i will give lap joint so that length comes 1Mtr
what is civil enginnering & what you need of this course?
Why Is Propping Required For Long Structures Once The Form Work Is Removed?
flow of fluid takes place viscosity compressibilityu surface tension deformation under shear force
The portion of a brick cut across the width is called?
What is meant by solid geometry?