Answer Posted / girish rawat
THE LEAST COUNT OF THE LEVELLING STAFF WAS 5MM EARLIER.
NOWADAYS YOU GET LEVELLING STAFF WHICH HAS 1MM ACCURACY ON
THE REAR SIDE. CHECK IT OUT
| Is This Answer Correct ? | 38 Yes | 7 No |
Post New Answer View All Answers
can any one give me sample question paper of BHEL at mdansari86@gmail.com as i m appearing for the same exam.
What is .Dwg?
Can a wave happen in the middle of the ocean like in the movie poseidon 2006?
In the roof of a pumping station explain briefly the components of a waterproofing system?
What is difference between combin footing & rapt footing
Calculate the maximum allowable speed on a horizontal curve of radius 350m if the maximum allowable values of the lateral coefficient of friction are 0.14 and the rate of superelevation is 0.08.
what is the procedure of wet seiving. n percentage of silt in different type of soil?
What expenses counted in contingencies and how much it is in related to built-up area of the building.
How much sand and cement requirement for 1 SQM 125mm thickness Brickwork
What is the FE 250 structural steel of 8mm tk plate testing sample intervals with IS code or international code?
what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter
What things architect have to take care of before starting any project?
Define What glue is least sticky?
How high should the water tank be to provide a 60 psi at base of this water tower?
how many shuttering material required for 1000 sq.m built up area.