Answer Posted / girish rawat
THE LEAST COUNT OF THE LEVELLING STAFF WAS 5MM EARLIER.
NOWADAYS YOU GET LEVELLING STAFF WHICH HAS 1MM ACCURACY ON
THE REAR SIDE. CHECK IT OUT
| Is This Answer Correct ? | 38 Yes | 7 No |
Post New Answer View All Answers
What are the basic use of runners and standards of pipelines?
how we calculate the vol.of wet concrete..?
What are the materials used in building a gravity dam?
how to calculate the steel in 500yard
how to identify np3 pipe and np4 pipe
Time required for curing of wall tiles before fixing
How to find out slope footing concrete
what is the max. area can we apply the plate load test ?
I what know about life time of frp tank plz explain about it specifications & other details
What is thumb rule in quantity and cost estimation of a residential building?
how much cement is consumed by a stone masonry wall 17.7m long,0.55m wide and 1m high
The largest size of paper used in plotter to print the drawing made by Autocad .
what energized you to complete your course?
What is the significance of cost estimate knowledge for an architect?
What out turn civil works