A civil engineer must be able to read drawings and its
sections, co relate it to its consultants drawings, clarify
discrepancies in drawings,should be aware of IS codes, basic
quality needs, preparation of bills, preparation of bar
charts and MS Projects.
He should have planning skills and get the work done from
resources available.
| Is This Answer Correct ? | 73 Yes | 3 No |
Post New Answer View All Answers
If specific gravity of cement is less than 3.15 what is the cause?
What is componsation
In which code the the maximum height of concrete casting has been explained
How to make tiles floor step by step procedure?
The mixture of different ingredients of cement is burnt at?
What is need for setting limits?
can any one explain bar bending schedule of bems and columns and slabs ??
Providing ,Cutting, bending and positioning of TMT Bar with cost of binding wire
what are RIB slabs explain about it
For the calculation of bearing pressure below the footing, to know whether it is below the safe bearing pressure of the soil, the unit of RCC below ground level to be taken is 25 KN/m3 or (25-15)KN/m3, where 25 is the unit weight of RCC and 15 is the unit weight of soil and whether the weight of backfilling to be taken?
How much material will consume for following specification water tank (9*7.5*6 feet)?
how to calculate the material from ratio of work PCC, RRM,POINTING, RCC
What are the applications of modulus of elasticity?
Is there the dry coefficient of cement is constant?
What are the different approaches in designing the floors of the service reservoirs?