How to take the Vector Group Test in Transformer? What is
the purpose
of doing Vector Group Test?
Answer Posted / vaijanath bablade
my true Love priyanka
Is This Answer Correct ? | 1 Yes | 7 No |
Post New Answer View All Answers
How to decide whether A / B / C / D curve type MCB should be used?
i have seen one 8.4 MW synchronous motor in a plant located in bellary it is fixed with brushless rotary rectifier ,anybody can explain its start up principle
how to convert lv line to hv line and viseversa, any losses will occur during this process
limitation of conductor height on ground when we consider EMC
what is the purpose of using filters in a protective relaying scheme?
Is neutral transformer can be called as control transformer?
what are factors to be consider in electrical installation like load factor,diversity factor .....
what is the safty of poly phase tranformer?
What is the formula formula for Busbar sizing and what are the things to be consider for Busbar Calculation?
Please explain, how to test vector group of tranformer(Delta y1) . Thank
Is it required to lay 2 runs of GI wires along with armoured cables from one power DB Machines of higher rating?
What will happen if we introduce negative feedback to a control system that uses a positive feedback?
distribution transformer de-rating formula on over limit iron losses
what is mppt (maximum power point tracking ) and how they used in solar power generation ??? what are the main components used in mppt?????
Z transform is use when system is not a) converges b) diverges