How to take the Vector Group Test in Transformer? What is
the purpose
of doing Vector Group Test?
Answer Posted / vaijanath bablade
my true Love priyanka
| Is This Answer Correct ? | 1 Yes | 7 No |
Post New Answer View All Answers
State the methods of improving power factor?
where is core-type and shell-type construction suitable for transformers ?
what is method for testing CT
Define average demand?
What is maximum power transfer theorem?
what is the difference between the voltage of 5 volts capacitor and and 5volts battery?
what are the differant std sizes of cable trenches?
How to work E.L.C.B and how to connect in circuit.
what's the requirement of Dy11d0 connection of 3 phase transformer?what's use of it?
plese send me the oces/dgfs sylabus and previous year question pattern of electrical engg.?
what is mean by kneepoint voltage? when it will happen? ( my doubt is, if CT secondary is open means ct get saturation or blas? what are factors are required for calculations? plz give currect anws:
what is the solution for meger test failed the MV cable?
what is arc flash and what are the hazards involved
What is FTA card? How it works?
why co incidence factor considered in transformer sizing?