If there are two sub processes then how can we call at a
time one sub process dyanmiccally by using call porcess?

Answer Posted / neela

In call process we have process name dynamic override, this
helps us to call the specific process while running.
For ex: we have 2 sub processes in which while running
based on some condition we are calling a single sub
process. If else Condition can be given for Dynamic
overriding. etc.,But here both the sub process should have
the same input,output and error schema.

Is This Answer Correct ?    9 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Which group do you use to wait for multiple events and proceed with the first to occur ?

651


Hi i want to learn TIBCO. I am not good at programming.. Which module should i prefer to learn in tibco. i am having 2 years exp in another sector, now i m planning to change my career path. Please suggest me.

2175


What is import and include in schema in tibco bw?

2197


Which one to prefer, Soap over JMS or Soap over HTTP in web service. Explain their pros and cons.

885


Where do the default global variables declared in designer are stored in tibco administrator?

571






If you are posting a message on a queue & Server is down. What happens.

1343


If you have installed a particular version of tibco software e.g. Tibco bw x.y.z, what are x, y and z number stands for?

623


What are the cases where business process cant proceed correctly subsequent to restart from a checkpoint ?

605


What is target namespace and taget prefix?

1233


What activities are supported in xa transaction ?

603


What is the difference between publish by value and publish by reference?

586


What is the purpose of a lock shared configuration resource?

579


What is the default axis in xpath ?

614


What is process name dynamic override?

614


Where does the tibco admin maintains the version history of the application? Please tell us the path?

571