What is the unit weight if concrete?.
Answer Posted / thenraj
rcc - 2.5 ton/cum,pcc- 2.4ton/cum (or) rcc-
25 kn/ cum, pcc - 24KN/cum (or)rcc- 2500 kg/cum, pcc-
2400kg/cum.
| Is This Answer Correct ? | 9 Yes | 20 No |
Post New Answer View All Answers
how much is the maximum compressive strength of soil cement and soil-cement-microsilica .
What is the difference between the concrete mix design carried out by IS10262 and by ACI method ?
How much cements bag (or in KG) required for 1 Sq. M concrete, for M-30 grad concrete as per CPWD and where is thr proof on site
pls tell me , what is the water content
Whats be the minimum foundation depth of multistoried building as per height of building in individual footing?
Providing ,Cutting, bending and positioning of TMT Bar with cost of binding wire
for G+2 residential building how much quantity of required in foundations,sub & superstructures per sq ft area
What is the difference between absorption & adsorption and sorption?
how much one carpenter can doing shuttering of slab in one day
material used for mendrel use to bend epoxy coated rebar
please briefly explain calculating or estimating steel quantity for a RCC column?
Can we weld hot rolled steel ASTM A615 ? Please Give the detail answer please thanks alot
What is the usage of zoom command?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???