Answer Posted / sjtbehera
1. under rimed pile
2. rigid pile
Is This Answer Correct ? | 4 Yes | 2 No |
Post New Answer View All Answers
how much tempareture are required to make liquid state of pid leed
what is your role of in previous company as a construction manager
Civil engineering material testing Standard results
16 questions out of 55 were from the book GUPTA N GUPTA OBJECTIVE of civil engineering. Total ques were 4 ques from hydraullics, 7 from BMC, 4 FROM SOM, 4 from soil mechanics, 6 from transportation, 5 from engineering drawing.
please what are the required bars for a beams of 6mx6m and 450x300mm, one is continuous and the the second is discontinuous ..Its a commercial building (church)
What is chemical composion test
What is Density of cement, sand & aggregate ?
What is dead load impact load live load
WHAT THREE SPECFIC JOB POSITIONS TO YOU TARGET FROM THE COMPANY?
How much area will be covered in 1 litre of Velvet touch paint in normal wall condition
How many pyramid in egypt?
What do you understand by “preset” during the installation process of bridge bearings?
What is fineness modulus ? and its sieve # ?
Consumption of Binding wire for fixing of cover block in vertical surface
what is stressing