Answer Posted / abhishek upadayay
The Integrity Pact is a tool developed in the 1990’s by Transparency
International to help governments, businesses and civil society to fight corruption in
the field of public contracting. IP establishes mutual contractual rights and obligations
to reduce the high cost and distortionary effects of corruption in public contracting.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
It takes eight hours for a 600 km journey, if 120 km is done by train and the rest by car. It takes 20 minutes more, if 200 km is done by train and the rest by car. The ratio of the speed of the train?
There are 5 questions based on a murder story.the questions concentrate on the seating arrangements of people mentioned.
There are Brown and Black cows. In five days four black cows and 3 brown cows give as mush as milk that four brown cows and 5 black cows give in four days. If the black cow gives 10 litres of milk per day, how many liters of milk the Brown cow will give in one day? (Numbers are not certain)
How can 1000000000 be written as a product of two factors neither of them containing zeros
Find the next letter in the series A,C,F,J,0--
if the area of square increases by 69% then side of the square increases by:
in how many ways can a lock be opened if that lock has three digit number lock if the last digit is 9 and sum of the first two digits is less than or equal to the last digit. numbers are from 0-9
A can work three times as B can work. If A takes 60 days less than B to complete the same task, calculate the number of days when both A and B start working together on the same day.
A cube 3"* 3"* 3" is painted green it is cut into 1"* 1"* 1" how many cubes were painted on atleast on one side
in pure milk if 20% replaced by water and in this again 20% is replaced by water and again 20% is replaced by water then what is the proportion of milk in that mixture
What is the maximum number of half-pint bottles of cream that can be filled with a 4-gallon can of cream(2 pt.=1 qt. and 4 qt.=1 gal)
A team of 200 wagers undertakes building work of a bridge. The total time allocated to build the entire bridge is 20 days. After 10 days since start, 200 more wagers join the team and together the team completes the bridge in required time. If the original team do not get those 200 extra wagers, how many days they would be behind schedule to complete building the bridge.
If the area of a square increases by 69%, then the side of the square increased by
Find the result of the following _expression if, M denotes modulus operation, R denotes round-off, T denotes truncation: M(373,5)+R(3.4)+T(7.7)+R(5.8)
A son and father go for boating in river upstream. After rowing for 1 mile son notices the hat of his father falling in the river. After 5 min. he tells his father that his hat has fallen. So they turn around and are able to pick the hat at the point from where they began boating after 5 min. tell the speed of river.