Post New Answer View All Answers
for pretensioning which will yield first and same for post tensioning?
what is the relation between pitch of steel and depth of slab?
What is meant by engineering drawing?
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
Why is the statue of liberty made of copper?
what is tension & compression of steel bending.
How to find beam R/F cutting length
What are the different methods for drawing an arc?
why we use for testing of compression strength concrete the size of specimen 150x150x150. why we are not using another dimension like 100x150x100 uneven dimension.
What do you mean by tolerance factor of concrete ?
Explain the various stages of the project planning process in construction?
How can we convert weight batch to volume batch for m30 mix
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
What are the different theories of failure under static load?
what is the meaning of degreasing of the euipment or line.