Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

can SMPS work in DC supply ?

Answer Posted / a.mitra

yes,smps works in dc supply.we know that ac means high &
low supply,but smps needs stable supply oparate,so smps
works in dc supply.(A.Mitra,ultadanga)

Is This Answer Correct ?    4 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Is it possible to operate a synchronous 2-poles turbogenerator with a still-in-place faulted bar but electrically disconnected ???? If yes, should I act on the other phases as well ???

1926


UG cable sizes were specified in sqmm. But practically its not coming to mesure. What's the reason for that? And how they specify the size of the cable?

1876


what are the steps involved in generator load test?

1508


Can anybody post questions asked in Engineers India Limited Interview? Thanks in advance.

2327


Define availability (operational)?

1098


We have 5 Distribution sections with variable loads&We have 3 Gensets(500kva,380kva&250kva) our total load is between 400kva to 600kva. so how could we connect 3gensets.

1800


What is different between Difnit time and instatous over current relay

2463


Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.

1987


what about electrical pannel.? What is meant by plc pannel.?

2231


mccb service sittings be done?

1887


Give accurate definitions for these electric terms: Inductor Inductance Inductive Induction Reactance Reactive Esam Baraka ٢١ ساعة

1340


i am an maintenance engineer. one distribution board have 5 feeder. recently its ELR trips frequently, but it take some times after trip( 10min,20min..)but 3 feeder no load. two feeder only loaded. i checked one feeder IR value all values are above 50Mohm.but B phase to Earth is only 9Mohm.any problem about low value

1872


Explain the process of commutation in a dc machine.

987


What is the difference between rulling span and wind span of of an Over Head Transmission Line?

2270


What is the reason that the humming sound is coming from the induction furnace panel?

2544