What is the accepted silt content in sand for concreting
purpose by volume method?
Answer Posted / sjtbehera
3%
Is This Answer Correct ? | 6 Yes | 8 No |
Post New Answer View All Answers
Why reinforcement done in shorter span in two way slabs
what is diffrence between catchment area,watershed and basin?
explain what do you mean by the property development.
What is the difference between routing maintenance and major maintenance in school facilities?
writte a c prog. to acept 5 no. from consule and then display them back on consulte in ascending order
Difference between pre-tensioning and post-tensioning.
how to identify np3 pipe and np4 pipe
Design a built-up column carrying an axial load of 1200 KN. Its length is 8m and it is effectively held in position at both ends and restrained against rotation at one end. Assume yield stress of 250 mpa
WHAT WII BE THE WATER ABSORPTION POWER OF WOOD ?
how to take the quantity of block work and plastering 1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate
I am a civil engineering student and going to attend interview in this week in an IT company.Will they ask me questions about my area of interest or cs
can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now
Material calculation of cm 1:6 for 1sqm
For Granite Flooring,For Cement Slurry purpose which one is effective of cost control whether OPC or PPC or White cement?
WHAT R THE GENERAL TECH QUESTIONS ASKED FOR THE INTERVIEW FOR AN AUTOMOBILE INDUSTRY,SPECIALLY DESIGN DEPT