Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

On concrete surface 1sq.ft area hacking no's of hack?

Answer Posted / javed shaikh.

Its should not less 50 nos for Sq.ft & 500 nos for 1 sqmtr
area

Is This Answer Correct ?    5 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

In cement concrete how to check a quality of material also proportion of material at site ?

1859


what is total volume of ingredients used in concrete accordingly

2243


In the present situation of ban on mining sand from rivers,can we go for formation of earth dam filters viz;Horizantal sand blanket,inclined chimney and filters under rivetment with crushed rock sand of 6mm down size.If so what are the specifications and is there any codal provision for its authentication?

1973


PCC Road Min Grade M 30 for VR standard Mahatashtra load 30 KN. what should be thickness of pavement, width 4m what should be length of panel.

2577


sir please send me campus placement questions in civil engineering

3587


how i can calculate the actual nos & size of steel to make 1000sqft. x 3"thick slab

2441


Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??

2712


What is meant by a context menu in a cad software?

1103


How to find coloumn vertical cut length floor to floor & lap + bend or anything plz clearfiy

2045


why top layer of block work shoud be full size if any cut block adjustable than another layer?

2201


What is the Tor steel Consumption for residential building G+24 footing (thum rule) ?

1848


how to calculate weight of 1.8 cum of aggregate

1733


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

2452


What are the different types of civil engineering?

1165


Hi.. Can i get hel in finding HPCL previous year question paper? plz help me in finding thiss..

2876