Answer Posted / r.satyanarayana goud
MBOOK means measurement book which is used in construction filed to record thge executed quantity of works
| Is This Answer Correct ? | 67 Yes | 4 No |
Post New Answer View All Answers
hoe much fine & sourse agregate required for concrete mix of 1: 1.5:3 by volume in Cu.Ft
What is the yield of 100 litres of water and 10 kg of cement in grout mix?
Why should you show Client/Engineer activities clearly on the project plan?
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
What is the snap size in civil and how can we create it?
How will be cutting in timber plate size 600*400 column size
Which is the most prominent tower of world?
what is the calculation of raw material for 0.35cum of m-15
What is the density of most of construction materials?
significance of specific surface area of particles?
A 16 pile group, consisting of diameter concrete piles, were cast in situ in a clayey soil whose unconfined compressive strength is 1100 psf. Each pile is 60 ft long and the pile spacing is 2.5 times the pile diameter.The water table is at the ground surface and saturated unit weight of the clay is 118 lb/cu.ft. using a factor of safety 3 and a reduction factor =0.45, compute the allowable capacity of the piles acting as individuals
How much quantity of rod binding work by a rod binder per day
how to preaper for interview wat they asked in interview give me idea
how to find out hard strata in bored pile when the DMC method adopted.
why the openings of sieves are square io size?