Why A.C. capacity given in Ton.
Ex. - 1.5 Ton
Answer Posted / ghanshyam tiwari
Every thing has scale to measure such as cloth is measured
in meter and weight is measured in kg.so a.c. capacity is
measured in ton and 1 ton refers to "It is the amount of
heat required to melt 2000 pond of ice into water of 32
degree farnehight during a period of 24 hours."
| Is This Answer Correct ? | 14 Yes | 7 No |
Post New Answer View All Answers
What is the basic principle of operation of alternators/dc generators?
we have a lot of model of rectifier but thyristor rectifier is the most rectifier that use in power system. Do you know why this rectifier is used?
Which motor is 3.3 or 11kV more reliable, in terms of efficeancy,maintenance, reliability.
what do w do when the output of generator is fluctuating?
does any one know where we can purchase insulation oil for high voltage oil filled cables
Which contains in POLE ASSEMBLY of a 11KV Kirloskar-make SF6 (Model No-FP620A12)? Will u clarify with drawing?
What is the different between digital phase converter and ordinary phase converter?
how to calculate kvar in Akiva
Would you recommend to replace all oil filled cables with xlpe cable for hv transmission with the current technolgy for xlpe cable?
sir, what is the importance of Fault MVA. how to calculate fault mva of 33kv substation connected by 6.5 km line(single circuit with equal spacing) with 110/11kv transformer in 110kv susbstation.the fault mva on 11 kv bus in 110kv susbstation is 208mva.
Please tell me the power flow from pmg to main rotor of an alternator (Including AVR unit)?
some time we open engine breaker 8.0 MW load but plant not trip. and another time engine open 4.0 MW load engine trip why? individually engine breaker open & individually emergency stop why difference?
What is the rating of circuit breaker needed for 300 KVA load in 33 KV supply line in a transformer of 33 KV / 415 Volt ?
what is the difference between general inverter and solor inverter clerly explain plz
Draw a SLD for main panel for school having connected load of 1200kw and emergency generator 200kw.also show the increase of additional load of chiller 225kw in the lv panel indicating meter postion size of transformer ,cables and capacitor bank.