Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is the exact load current needed for a place which has
100nos of bulb of each 100w?

Answer Posted / errol

assuming a 230V power supply:
I=P/V where P= 100W x 100pcs = 10,000watts
Total current, I, therefore is 10,000W/230V = 43.48A. The power factor is 100% bearing in mind that bulbs are resistive loads.

Is This Answer Correct ?    7 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the chiller and working principal

2381


how we can do the insulation on secondary of ct explain and so that tan delta will within limit

1984


How to configure the drives in PLC, through Profibus commnication. And to how to address it?

2880


What are IR values and what it should be for coil and for insulator

3040


1.how many types of relays? 2.difference between ATS& STS?

2197


why +24 v and -48 v give to BTS? If -48v protect from surge then why we not use -24 v?

1891


what is the physical connection of a analog i/p to a analog i/p module (ab plc)and through a analog o/p module(ab plc) to a analog o/p . and how all the process control by scada

1974


why is control bus bi-directional?

2214


WHAT ARE THE DISADTAGES OF SINGLE-WIRE-EARTH-RETURN SYSTEM USED FOR RURAL ELECTRIFICATION?

2015


Sir, My doubt on cable sizing calculation, Load:74 KW calculated cable 1 run 50mm2. Now client asking us to reduce cable size by increasing runs. Sir, My question now when my mind strikes with 2 options 1) Divide load 74/2 = 36 and calculate cable for 36+36 making it 2 runs or 2) Simply i can divide 50mm2 /2 ie. 2 runs of 25mm2 Please suggest me sir

2015


What are the main advantages of bode plot?

1291


what is charger supervision and control supervision?

2126


From reading, Under voltage relay used also as phase sequence relay now, Why I use under voltage and phase sequence relay in the same circuit (ATS)?

1833


how oil in the MOCB was reduced compared with OCB? what are the features of the MOCB?

2828


In a single how much maximum current and watts using

2214