Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what are the strenth of 1cum brick work

Answer Posted / om prakash narayan

1m3= 500 bricks

Is This Answer Correct ?    6 Yes 8 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

TELL ME THE EQUATION FOR OGEE SPILLWAY

2591


Define different types of roof systems?

1189


I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

2088


What is zoning permit?

1191


How much Tolerance factors like 1. brick work 2.plaster 3.painting 4.floor tiling 5.wall tiling 6.shuttering 7.concreting 8.steel

1842


Why steel rods are produced only in even dimensions?

2626


asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream

1940


what is right & short method of measurement of slab&beam

2073


How to identify the vitrified tile and ceramic tile by observation only after executing the job.

985


Define What is the distance between railway tracks?

1133


how much percent are used 20mm,10mm?

1960


can you give me the details of rate analysis of steel and concrete?

2983


What is the zero value in quantity surveying

2539


where i can get material costs on weekly basis

2153


Which percentage of carpet area use in plot area of office building.

2006