Answer Posted / om prakash narayan
IRC: 37
| Is This Answer Correct ? | 7 Yes | 0 No |
Post New Answer View All Answers
what is grade intersection?
Who designed the city of washington dc?
What is the method of soil replacement test?
what is the amount of absorption of slurry in shuttering ply board. what is the amount of slurry leakage allowed for 1 m3 of concrete.
explain fie benefits of using standard terminology in the measurement process
hi, i am appearing in HPCL(CIVIL ENGG.)exam. plz send me placement paper of this exam if u are having
how calculate the bearing from two coordinates?
how we can find sieve #4 is 4.75mm?
How much quantity water should be placed in one cubic meter area?
please briefly explain calculating or estimating steel quantity for a RCC column?
What quantity of 1.0 m3 bricks required?
what are the changes in concrete pour height as per IS 456, 2009?
What out turn civil works
Which tests are performed on soil to decide the type of foundation to be provided.
Dear Frds, How can i calculate the Steel for RCC Slab, Please provide one Example also, so that i can understand very well. Ex: Area: 1320.0 Sft.(44' X 30') Span: 15'(Default). Column Size: 9"X15"(6 No.s 12mm Rods) Please Provide Calculation Details. Thankyou. Satish