Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is derating?, why it is neccesary, it is same for all
means for drives, motors,and cables.

Answer Posted / mrinal

The current currying of cables will change depending upon
the site temperature (location of site), type of run(it
will run through DUCT, TRENCH, BURRIED ect.), number of
tray, depth of trench, distance between cables. Considering
this condition actual current currying capacity of cable
reduce than current currying capacity (which given to cable
cataloge) this is called deraing.

Is This Answer Correct ?    5 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

hi all i like to know vat is power plot in control systems also i want to know abt latest trends in electrical & electronics

1951


what is fault level of power system ?

6379


How does an induction motor start?

1218


please send me the previous year's question papers of jindal GET exams

5905


why and where we use early make & late break contacts in protection?

8324


what is laser diodes?

1160


What happened when voltage will half value of current ...

1616


54 Comments Alok and Bhanu play the following min-max game. Given the expression N = 38 + X*(Y – Z) where X, Y and Z are variables representing single digits (0 to 9), Alok would like to maximize N while Bhanu would like to minimize it. Towards this end, Alok chooses a single digit number and Bhanu substitutes this for a variable of her choice (X, Y or Z). Alok then chooses the next value and Bhanu, the variable to substitute the value. Finally Alok proposes the value for the remaining variable. Assuming both play to their optimal strategies, the value of N at the end of the game would be?

2191


if an insulated power and control cables of a running gas diesel gensets laid direct in an open trench i.e, trench bed is not rcc of a power house in which rain water, spillage water alwas exists and all power control cables remains submerged even when gas gensets of 480 kw each runningin on load. These power &control cables runs from power house to switchgear room through these trenches in which water remains most of the time. pl explain its merit & de-merit

1880


what is cascade speed control device?and how this device control the speed of motors?

2158


how can maintaince the acb contactor moveing and fixing kit

2078


slipring induction motor starting time Lrs operating why lrs starting time lrs outer body didn't get shock

1935


What will happen if a dc source is given to a tubelight. Will it work or wont it work....

1981


where we use the SFU & FSU?

2415


what is the safe meggar values for motor, transformer HT, LT and Cables? IF we want to replace I/C bay at our 220 kv substation which is of 140 mw load capacity bay to be replaced by 400 mw capacity bay.other than CT(1200/1) what are the other equipment i have to replace. why we generally use 3.5 core cable or in other word 1/2 core for neutral and also confirm me that in balance conditiob(3 phase)current in neutral will zero

2275