Difference between the setting time and hardenin time of
concrete
Answer Posted / guest
IST is the time after which
concrete or cement mortar
will start losing its
properties.FST is the time after
which mould can be removed.
| Is This Answer Correct ? | 1 Yes | 5 No |
Post New Answer View All Answers
what is castigliano theaorem
Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?
As we know that steel is a tension member but why we are using STRUCTURE STEEL as a COLUMN (Without concrete) where column is a compression member and compression strength of steel is very low
Does degree of bend of rebars has any effect on strength of the member? For example- if a beam is designed with 45 degree bent up bar with respect to architechtural needs and is not 45 in practical so will there be any reduction in the strength of member?
what course did you consider thinking before you enrolled in college?
Volume of 25kg putty bag & 40 kg putty bag volume??
What is the snap size in civil and how can we create it?
. Write a C program to perform following functions:- a. Declare one integer variable of all the storage classes. b. Print all the variables without assigning any values in tabular format. a. The tabular format must contain the variable name, type, storage class and printed value on the screen in RED color.
what are the grades of concrete?where and or what purpose a particular grade is used in a particular structure?
Explain creep?
What is a bearing capacity of soil?
What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.
1.what is the mix proportion for cement soil compressed earth blocks? 2.how to calculate the mix proportion for cement stablised earth soil blocks?
A sieve analysis results in 100% retained in no. 50 Sieve, the fm is?
why we create short columns under grade slab?