Difference between the setting time and hardenin time of
concrete
Answer Posted / guest
IST is the time after which
concrete or cement mortar
will start losing its
properties.FST is the time after
which mould can be removed.
| Is This Answer Correct ? | 1 Yes | 5 No |
Post New Answer View All Answers
How many mortar required for Brickwork of 1 Cu.m works??
What are the techniques to measure road difference?
what is the hanekom repairing material after concreting work
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
what radial pressure, the NP2 class rcc pipe can sustain?
How you can turn off the display for dimension in CAD?
what are the cube & Sylinder strength of concret M20,M25,M30,M35,M40,M60 ,M75,M10 ,M15
WHAT DLC DESIGN IN CONSTRUCTION
How can I make justification between using concrete grade c35 compare c37?
TELL ME THE EQUATION FOR OGEE SPILLWAY
PLS.......... ANY ONE CAN FORWARD ME PREVIOUS QUESTION PAPER hpcl civil engg
what would be the design load of R.C.C Cooling tower per cell.?
WAP to print 1) 1 1 1 1 1 1 1 1 1 1 2) 1 2 3 4 5 6 7 8 9 10
in design case of structural member best suitrable percentage of steel limit is what
Give list of building construction equipment & explain about them in brief. How much is output of JCB, POCLAIN, Steel cutting & bending machine, material hoist, tower crane?