when voltage increases then current also increases then what is
the need of over voltage relay and over current relay?
can we measure over voltage and over current by measuring current
only?

Answer Posted / nithi

NO.We can't sense the over voltage by just measuring the
current only.because,
The current increases not only for over voltages but
also for under voltage(As most of the loads are non-linear
in nature).
So,the over voltage protection & over current
protection are completely different.

over voltage relay meant for sensing over voltages &
protect the system from insulation break down and firing.

over current relay meant for sensing any internal
short circuit,over load condition ,earth fault thereby
reducing the system failure & risk of fire.

So, for a better protection of the system,It should have
both over voltage & over current relay.

Is This Answer Correct ?    15 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

sir please send me previous year questions of jspl of electrical section through which i could prepare myself fpr the test.

1501


How Load Factor, Demand Factor, Diversity Factor etc best applied in designing an electrical circuit? Is it allowed to consider these factors in each and every panel in an electrical distribution system? Can any body suggest a good book for reference?

2465


what are the interview question asked in wind mill about electrical

1927


How many types are using in 220kv/400 kv swith yard

1754


How to test lightning Arrester?

403






when measure the core loss of three phase distribution transformer or three phase reactor loss, one phase shown negative watt loss. why??

1524


how to select overload-relay for perticular motor 1.for D.O.L. starter 2. for Star-delta starter ????

2390


how can service sitting be setted for MCCB?Example for sittings IR (CURRENT RATING),IS(CURRENT STARTING) I O (current operating)?

1749


some time we open engine breaker 8.0 MW load but plant not trip. and another time engine open 4.0 MW load engine trip why? individually engine breaker open & individually emergency stop why difference?

1323


WHAT IS MEANT BY TV TERMINAL IN 500MVA TRANSFORMER?

1718


HOW DOES THE ELECTRONIC ENERGY METER WORKS?

1620


what is stper motor

1990


What size cable (based on voltage drop) is required to supply a 40 A three phase boiler if the wiring system is 75V single insulated cables installed in non-metallic rigid conduit 56m from the main switchboard? Voltage drop in the consumer's mains is 8V.

1489


What is accuracy of a measurement?

723


1.4 What is meant by CT knee point voltage and how would you determine it

1162