What is the value of nuetral current in star connected load
when DC is supplied to it???

Answer Posted / gajanan

algebriac addition of all currents

Is This Answer Correct ?    2 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Can you explain about pole discrepancy scheme

1719


When we giving the 3 phase supply to ups system how to coming netural?

1648


How to reduce the static electricity producing in solvent room? By P.D.Patil BioCon

1583


List few applications of d.c series motor?

706


How to select the cable and voltage drop in circuit?

1187






write down the formula of cable size in RM if current is 50Amp.

923


We normally make oil soak pits under Transformers. Oil from soak pit goes to collection pit. We provide granules/pebbles under transformers. My question is weather granules/ pebbles to be filled in soak pit or not? if yes upto what level?

9886


What is the role of power pack in substation protection system?

2236


What is transient Phenomenon?

1783


Which device is used for the source of emission of electrons in a crt?

735


sir i have a car stereo system and there is jack on him so can u tell me a way to find out their power terminals on the jack or on the circuit board"

1566


Bimetal strip used in overload relay what is that,which types of material used for that & percentage.

1794


The shot circuit in any winding of transformer result? Explain

799


HOW TO CALCULATE CAPACITOR BANK OR HARMONIC FILTER CALCULATION

1790


Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.

1574