Answer Posted / peer mohd
coloumn top and below floor level
Is This Answer Correct ? | 12 Yes | 3 No |
Post New Answer View All Answers
in block masonry l=10',b=0.5',H=10',Calculate cement ,sand and no.Of blocks?
How will you Engage Labours on Site?
what is the mix design for M:60 with micro silica andmetakaoline?
I am practising engineer. I am searching for tutorial of RCC T Girder design Example in staad pro.Do anybody has this?please help
what is the proper procedure in conducting a california bearing ratio penetration test on soil on cbr machine?
What are the methods in tiles flooring ? What are the methods in brick work? What are the methods in plastering ? What are the methods in wall tiling?
How to calculate carrying capacity of the existing water supply trunkmain
What is a projection line?
which type of instrument included in plumbing work?name of instrument?
For what building Built-on balconies are preferable? What are the advantages?
Define What happens to Load at yielding ?
What is the coeffiencent Friction Angle between Steel and Ashphalt?
5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
If we don't have drawing for Excavation of building,At what rule we will go for excavation and how much depth will go for a villa?