Difference between the setting time and hardenin time of
concrete
Answer Posted / viplav
setting time of concrete is initial mix and hardenin time
is 0ne hour.
| Is This Answer Correct ? | 5 Yes | 9 No |
Post New Answer View All Answers
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
What is the quantity of cement used for stone pitching work of 100sqm 225mm thick and cement mortar of 1:6? And how?
Please let me know about answer for my Question as "What is the maximum wastage allowable of HYSD Steel in any Bridge project as per Code and Code reference also ?
List out some of the checking’s, done at the completion of construction?
What is a projection line?
What are the standard plastic limit/liquid limit/plasticityindex for differrent type of soils?
Is it possible to make a feature using an overdefined sketch?
What is high adherence steel bar? I have a general specification which refers to High Adherence steel bars, coils and meshes to BS EN 10080 and BS 4449 or BS 4483. Is this just general re-bar or is there something different about it? The spec originated in France.
What are the responsibilities of a site manager?
pls give me ans to ACT formula cube testing porpuse
What is 1/8 on the architect ruler denotes?
What is the difference between undo & redo?
What is semirigid connections?
How can we convert weight batch to volume batch for m30 mix
Coverage of 25mm.thick ratio of 1:4 cement mortar?