Difference between the setting time and hardenin time of
concrete
Answer Posted / sujit ( hari machines)
setting time is taken by concrete to its minimum strength
in 7 days. harden time is time taken by concrete to its
maximum strength.
| Is This Answer Correct ? | 5 Yes | 10 No |
Post New Answer View All Answers
List out some of the common problems that architect have to tackle it?
GIVE US YOUR FULL DETAIL OF THE FOLLOWING… FULL NAME.. PERMENENT MAILING ADDRESS DIRECT CONTACT NO E MAIL ADDRES.
hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard
the distrubution system in water supplies is designed on the basis of avg daily demand peak hourly demand coincident of draft greater of B & C
What is meant by dimensioning?
how to find quantity of concrete in PCC M15
which red: used in roof teping, then use only cement
how do we calculate quantity of cement sand and aggregates in 1m3 of m20 m25 grade concrete?
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)
The foundations are placed below ground level, to increase?
What is the standard rate of installing ties for column(60cmx60cm) and beams(50x850)(weight)
sir iam dng my engg final yr (civil) iam intrested to write group_1 .if we write this exam what kind of jobs we get and what should be the minimum score for us to get qualified and iam having reservation too.
how much cement and sand required for 100sqm of wall plastering in different proportions
I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.