why we put pocket in some structure instead of bolt.
Answer Posted / basu
if you bolt are fixing at the costing time there is no
tollerance it is basic
to pravide the greater strength in verry minimum area to go
for higher strength (g p cement)
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
What is the tensile strength of wood?
While calculating the weight of the steel per running meter, the formula used is [(dxd)/162]. Why 162 is used in denominator & how it is derived?
Is it possible to make a feature using an overdefined sketch?
Define line type?
what do you know that m20,m25
Currently my house construction is going on but we just realized that the portico earth beam couldn't connect with the original earth because the beam rod not extended so Please advice
What is meant by scaffolding coefficient?
what will be price of 1:2:4pcc per kg?
what is smart building materials?
How to calculate steel for beam slab and column
What is the Roll of Water Bonding under VDF road?
Did any of the egyptian pyramids ever fall down?
which steel is better for residential building tmt steel or hysd steel
how much of the strength comes from post-production curing
What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.