why we put pocket in some structure instead of bolt.

Answer Posted / basu

if you bolt are fixing at the costing time there is no
tollerance it is basic
to pravide the greater strength in verry minimum area to go
for higher strength (g p cement)

Is This Answer Correct ?    1 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How many types of slabs are there & how to design it?

782


How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.

1016


How you can turn off the display for dimension in CAD?

651


What is the strength of cement?

712


Is there any course for billing available in Mumbai? If yes then please mail me the details..

1820






Permissible wastage of cement as per IS code ? In which IS code I get it?

1227


What is pre-stressed concrete?

670


For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)

1542


How to increase a bearing capacity of soil?

670


What is meant by Crystal Concrete?

1280


While calculating the weight of the steel per running meter, the formula used is [(dxd)/162]. Why 162 is used in denominator & how it is derived?

1145


What are the common ways of demolition?

732


What is the quantity of metal 1 & metal 2 to be used in 100 cft concrete?

2613


a rectangle grill of length 72 inch x 20 inch width.how to calculate bar spacing ,bar consist 8 mm thickness and spacing of bar is 2 inch.. calculate no of bar with formula

1227


Which code is used for tor & tmt steel bar?

766