Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is difference between Step Up Transformer & Booster
Transformer?
can we used instead of any one?

Answer Posted / prajokta ray

step up as we all know enhances the level of voltage...it
can only increase....on the other hand booster is placed
normally at the top of pole and it acts as substation for
lines away from main substation. its acts as a voltage
compensating device...ie..both increases and dec at full
load and no load....to the consumer...

Is This Answer Correct ?    18 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Is there a possibility to use such a treshold voltage for the NMOS part of a CMOS circuit that during the switching it will start conducting only after the PMOS part will be already closed, by this eliminating the leakedge current? Please note, I'm not asking about the well bias in standby mode, but about the "antileakedge" measures during normal operation.

2064


WHY TERTIARY OF POWER TRANSFORMERS IS LOADED WITH EQUIPMENTS LIKE CT,PT,ISOLATOR AND CB

1899


In between UPS out going changer over switch and ups raising main input, both side cable gland producing heat but the cable doesn't get heat,Why?

2261


standard earthing rating for power line..

2122


how much LT load can bear by the 100 KW HT connection.

2217


Showing results for capital, machinery, stock,wages, carriage in words, salaries, factory rent, repairs, fuel and power, buildings, debtors, sales, purchases, creditors, return outwords, return inwords, drawings, discount allowed, discount receivable, office expenses, bills payable, bills receivable, cash in hand, cash at bank, office rent comes under debit or credit

1520


As a electrical engineer.. what are the basic norms should follow in transformer oil testing.. 1.What is the Electrode type? 2.How long time you will give for oil testing?

3633


What does the term power factor shows?

1111


Pls mail me utility & Dg related question with answer

1781


I have a small system with two motors that are running on 380 vac, 60 hz. These motors are expensive and I usally get them from Brazil. I am adding another motor to the system, but I want to purchase a 480 vac, 60 hz motor to use. It will be on a VFD that is rated fro 380 thru 480. Is this posible and will I have to use a larger motor and derate it?

1962


what is the k var ratting of 1250kva

2070


How can we calculate strength of copper hich is supplying electric power to heater and in it hold the heater also and what r all types of forces which is acting on it...

1973


What if high voltage side circuit breaker of a ehv transformer instead of lvcb? Kindly elaborate.

1743


How servo stabilizer works.

2113


What are dependent sources?

1169