IS sobha developers ,bangalore an good place to work for the
freshers
Answer Posted / rakhi
Yes
| Is This Answer Correct ? | 22 Yes | 6 No |
Post New Answer View All Answers
What are the standard plastic limit/liquid limit/plasticityindex for differrent type of soils?
how to caluclate sienerge qty in construction in ap
Draw a neat sketch showing the 'throat' of a welding in a plate girder ?
What is the worlds largest concrete dam?
what r you reqired for concrete baching plant?
A 16 pile group, consisting of diameter concrete piles, were cast in situ in a clayey soil whose unconfined compressive strength is 1100 psf. Each pile is 60 ft long and the pile spacing is 2.5 times the pile diameter.The water table is at the ground surface and saturated unit weight of the clay is 118 lb/cu.ft. using a factor of safety 3 and a reduction factor =0.45, compute the allowable capacity of the piles acting as individuals
cement required for construction of 400mm*200mm*200mm concrete solid blocks for 1sq.mtrs,how?
What is meaning of tlc
what is smart building materials?
what is detail procedure of eccentric footing? plz. give solved exmple?
How is make concrete cube?
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
What are new methods /technologies of pothole patching?
What are the phases inspections are done by local authority while construction?
Whats be the minimum foundation depth of multistoried building as per height of building in individual footing?