25% of 12% of 4% of 1000 is ?
Answer Posted / san
Generally the option is not given in decimal point value, so its better tht v shld use fractional value...
ans is 1.2 only..tht means its 5/6
| Is This Answer Correct ? | 10 Yes | 6 No |
Post New Answer View All Answers
If the operation,^ is defined by the equation x ^ y = 2x + y,what is the value of a in 2 ^ a = a ^ 3
A finish the work in 10 days. B is 60% efficient than A. So hoW days does B take to finish the work?
how 1000000000 can be written as a product of two factors neither of them containing zeros
A chain is broken into three pieces of equal lengths containing 3 links each. It is taken to a blacksmith to join into a single continuous one. How many links are to to be opened to make it ?
1) 1)difference between ip and non ip protocol.
two workers can type two pages in two minuets then how many persons can type 18 pages in 6 minuets
two trees are there. one grows at 3/5 of the other. in 4 years, total growth of trees is 8 ft. what growth will smaller tree will have in 2 years.
A fuel dealer mixes two brands of fuel which cost in the ratio 2:3 A solution of 30% Brand A with Brand B yields profit of 10% when sold at RS 297. What is cost of brand B?
All men of this party are republican . mohan is member of this party. mohan is republican is true or false or camn't say?
total balls are z, the number of red balls is n and the remaining are blak balls,then the % of black balls equal to ?
If A/B = 3/5,then 15A = ?
what is the exact qualifing marks for group 1 prelims
Two trains move in the same direction at 50 kmph and 32 kmph respectively. A man in the slower train observes the 15 seconds elapse before the faster train completely passes by him.
What is the missing number in this series? 8 2 14 6 11 ? 14 6 18 12
Three men A, B, C can complete a work separately in some specified days (May be 8, 7, 6).If they do the work together by alternate days. Then how many days need to complete the work?