how preparing for barbending schedule ? how to preparig for
two leged stirrups?
Answer Posted / arif qureshi
first take clear span dimension.
bottom bar length = clear span+Ld of the bottom bar+2d.
where Ld=development length of the bar
2d = 2 X dia of bottom bar (extra length added for
elongation of bar due to bending).
Same formula is used for the top bar length.
Curtail bar length = Clear span -0.2(clear span)
Stirrups length = (((B+D)-4Cover)+ 10d)*2
Where B = width of beam
D = Depth of Beam
d = dia of bar used for stirrups.
Weigth per Meter length =d*d/162
Where d= dia of bar
| Is This Answer Correct ? | 51 Yes | 7 No |
Post New Answer View All Answers
i) Distinguish between Theodolite and dumpy Level? (Marks-8) ii)Distinguish between Viscous and Turbulent flow? (Marks-8) iii) Distinguish between nominal and design mix? iv) What is standard sand? v) Explain the term plane stress? Vi) Differentiate between principal plane and principal axis? Vii) write short notes on Elastic limit of structural steel? viii) Write short notes on stress concentration? ix) write short notes on "Grading of Sand" ? x) How many grades of concrete are there under standard concrete?
The 4 main factors to start a construction project are––
types of piles detail,
How did street originate in the plumbing term street ell?
how to prepare site mix design
explain what do you mean by the property development.
what is BPM in concrete demolition hammers. what is better a higher value or lower
How can you achieve soil enforcement?
What are the methods in tiles flooring ? What are the methods in brick work? What are the methods in plastering ? What are the methods in wall tiling?
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you
How to calculate plastering for elevated water storage tank
How much quantity of cement and sand required for the inlining of 610mm dia MS pipe 8.7mm thk.Inlining thickness is 10mm and CM ratio is 1:1.5.
Why do we not deduct steel volume to find actual volume of concrete in practical as we have studied that,,, actual volume of concrete = volume of column- volume of steel pls explain with reference of IS code?????
what is the percentage of silt in black cotton soil.?